Description
Approximate time
25 to 45 min
Inclusions & Exclusions
- include labour charges for the job only.
- Main Distribution Board Fitting or Installation – Fixing the DB box.
- Main Distribution Board Replacement – Removing the old DB & replacing it with a new one.
- Any material or spares that ay be needed for the job.
- Additional wiring to different connection points. If required will be charged extra.
Procedure
- Charges mentioned are for Inspection only , Final quotation will be shared after Inspection.
Reviews
There are no reviews yet.